42-215-31605

Final Completion

HAMMAN D

HIDALGO County · District 4 · FAULCONER ENERGY LLC · MONTE CHRISTO (FRIO CONS.)

RRC Lookup

Permits

1

Max Depth

12,000 ft

First Permit

1985-04-24

Latest Activity

1985-04-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-06-21

Shut-In

Plugged

2025-10-27

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: FAULCONER, VERNON E., INC. (reported 2021-10)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: BRIGHT & CO.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2025-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#273118 A BRIGHT & CO.
received 1985-04-17

Well Details

Well Number
2
Max Depth
12,000 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1985-06-21

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora