42-215-31690

Final Completion

HIDALGO WILLACY

HIDALGO County · District 4 · WYNN-CROSBY OPERATING LTD. · TEXAN GARDENS-TABASCO N. (CONS)

RRC Lookup

Permits

4

Max Depth

9,000 ft

First Permit

1986-03-04

Latest Activity

1997-07-21

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-07-11

Shut-In

Plugged

2015-09-14

!

EWA / Production operator mismatch

Scheduling: WYNN-CROSBY OPERATING LTD. ≠ Production: AMERAC ENERGY CORPORATION (reported 1997-08)

!

EWA / Permit operator mismatch

Scheduling: WYNN-CROSBY OPERATING LTD. ≠ Permit: AMERAC ENERGY CORPORATION

Resolved via: schedulingWYNN-CROSBY OPERATING LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2015-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#465192 A AMERAC ENERGY CORPORATION
received 1997-07-21
#401893 A BARNES, LARRY PETROLEUM, INC.
received 1992-10-29
#401893 A BARNES, LARRY PETROLEUM, INC.
received 1992-07-31
#299205 A TANA OIL & GAS CORP.
received 1986-02-20

Well Details

Well Number
4B
Max Depth
9,000 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1997-07-11

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
1,473,911 bbl
Cum Gas (all leases)
16,673,553 mcf
Activities
OPRS/G, OPRS/O
Total Permits
41

External Links

Live © 2026 Petrora