42-215-32825

Directional

ZAMORA-VELA

HIDALGO County · District 4 · CHESAPEAKE OPERATING INC. · PUERTO RICO (VICKSBURG)

RRC Lookup

Permits

2

Max Depth

10,300 ft

First Permit

2000-11-09

Latest Activity

2000-11-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2001-05-03

Shut-In

Plugged

2008-12-11

!

EWA / Production operator mismatch

Scheduling: CHESAPEAKE OPERATING INC. ≠ Production: WELDER EXPLORATION & PROD., INC. (reported 2001-07)

!

EWA / Permit operator mismatch

Scheduling: CHESAPEAKE OPERATING INC. ≠ Permit: WELDER-HEYER ENERGY, INC.

Resolved via: schedulingCHESAPEAKE OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-01

Last Production

2008-12

Operator History

originally filed by WELDER-HEYER ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#501781 A WELDER-HEYER ENERGY, INC.
received 2000-12-07
#501781 A WELDER-HEYER ENERGY, INC.
received 2000-11-09

Well Details

Well Number
1
Max Depth
10,300 ft
Drill Type
Directional
County
HIDALGO
District
4
Completed
2001-05-03

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
120,218,990 bbl
Cum Gas (all leases)
5,501,647,035 mcf
Total Permits
13,061

External Links

Live © 2026 Petrora