42-217-30340

Final Completion

WOODALL

HILL County · District 5 · ADAIR TRANSPORT COMPANY · MT. CALM

RRC Lookup

Permits

1

Max Depth

1,250 ft

First Permit

1987-09-21

Latest Activity

1987-09-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-02-25

Shut-In

Plugged

2008-06-17

!

EWA / Production operator mismatch

Scheduling: ADAIR TRANSPORT COMPANY ≠ Production: ADAIR RESOURCES INC. (reported 1996-03)

!

EWA / Permit operator mismatch

Scheduling: ADAIR TRANSPORT COMPANY ≠ Permit: CARCO ENERGY, INC.

Resolved via: schedulingADAIR TRANSPORT COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by CARCO ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#336265 A CARCO ENERGY, INC.
received 1987-09-21

Well Details

Well Number
A 2
Max Depth
1,250 ft
Drill Type
Vertical
County
HILL
District
5
Completed
1988-02-25

Operator

Location
CORSICANA
P-5 Status
Y (filed 2008-12-05)
Cum Oil (all leases)
28 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora