42-217-30341

Final Completion

BURNETT C. C.

HILL County · District 5 · D OIL · MT. CALM

RRC Lookup

Permits

1

Max Depth

1,250 ft

First Permit

1987-10-19

Latest Activity

1987-10-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-02-25

Shut-In

Plugged

1991-06-01

!

EWA / Permit operator mismatch

Scheduling: D OIL ≠ Permit: CARCO ENERGY, INC.

Resolved via: schedulingD OIL

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by CARCO ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#337568 A CARCO ENERGY, INC.
received 1987-10-19

Well Details

Well Number
A 2
Max Depth
1,250 ft
Drill Type
Vertical
County
HILL
District
5
Operator
D OIL
Completed
1988-02-25

Operator

Name
D OIL
Location
BOERNE
P-5 Status
Y (filed 2009-01-09)
Cum Oil (all leases)
1,493 bbl
Cum Gas (all leases)
— mcf
Total Permits
8

External Links

Live © 2026 Petrora