42-219-33010

INJECTION

LAVERNE SHADDIX

HOCKLEY County · District 8 · BERYL OIL AND GAS LP · ILLUSION LAKE (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

7,900 ft

First Permit

1980-09-09

Latest Activity

2023-01-31

Lifespan

42 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2025-03-25

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-05

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#887742 A BERYL OIL AND GAS, LP
received 2023-01-30
#92041 A THRESHOLD-BLOCKER VENTURE
received 1980-09-09
Lat 33.788025
Lon -102.383757

Well Details

Well Number
1
Max Depth
7,900 ft
Drill Type
Vertical
County
HOCKLEY
District
8
Completed
2025-03-25

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
703,799 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
11

External Links

Live © 2026 Petrora