42-219-36192
Final CompletionRIPTIDE
HOCKLEY County · District 8 · BERYL OIL AND GAS LP · ILLUSION LAKE (SAN ANDRES)
Permits
2
Max Depth
10,100 ft
First Permit
1995-10-03
Latest Activity
2018-09-07
Lifespan
23 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2019-06-19
Shut-In
—
Plugged
2023-05-25
!
EWA / Permit operator mismatch
Scheduling: BERYL OIL AND GAS LP ≠ Permit: RELIANCE ENERGY, INC.
Resolved via: scheduling → BERYL OIL AND GAS LP
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1995-11
Last Production
2023-06
Operator History
originally filed by RELIANCE ENERGY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#844458 A RELIANCE ENERGY, INC.
received 2018-09-07
#440490 A MERIDIAN OIL INC.
received 1995-10-03
Lat 33.796051
Lon -102.435367
Well Details
- Well Number
- 1D
- Max Depth
- 10,100 ft
- Drill Type
- Vertical
- County
- HOCKLEY
- District
- 8
- Operator
- BERYL OIL AND GAS LP
- Completed
- 2019-06-19
Operator
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 703,799 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 11