42-221-30205

Final Completion

MAYES E. D.

HOOD County · District 7 · SMITH PIPE OF ABILENE · MCINTOSH (STRAWN)

RRC Lookup

Permits

1

Max Depth

5,200 ft

First Permit

1978-04-13

Latest Activity

1978-04-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1977-09-27

Shut-In

Plugged

2009-03-04

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: SWAIM, CHARLES (reported 2007-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TYRA, C. L.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-03

Operator History

originally filed by TYRA, C. L. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#22102 A TYRA, C. L.
received 1978-04-13

Well Details

Well Number
1
Max Depth
5,200 ft
Drill Type
Vertical
County
HOOD
District
7
Completed
1977-09-27

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora