42-225-30884

INJECTION

JONES JACK

HOUSTON County · District 6 · 84 ENERGY LLC · LAURA LA VELLE S. (1600)

RRC Lookup

Permits

1

Max Depth

1,800 ft

First Permit

1993-09-09

Latest Activity

1993-09-09

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2023-04-13

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Permit operator mismatch

Scheduling: 84 ENERGY LLC ≠ Permit: LOMAK PRODUCTION COMPANY

Resolved via: scheduling84 ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-10

Last Production

2026-03

Operator History

originally filed by LOMAK PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#415251 Pending LOMAK PRODUCTION COMPANY
received 1994-08-31
#415251 A LOMAK PRODUCTION COMPANY
received 1993-08-23

Well Details

Well Number
1
Max Depth
1,800 ft
Drill Type
Vertical
County
HOUSTON
District
6
Operator
84 ENERGY LLC
Completed
2023-04-13

Operator

Location
SUGAR LAND
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
639,335 bbl
Cum Gas (all leases)
644,237 mcf
Activities
CSGD/G, GTHS/G, OPRS/G, OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora