42-227-33935

DAVIS

HOWARD County · District 8 · MONTERO OPERATING INC. · PRIMERO (WOLFCAMP UPPER)

RRC Lookup

Permits

3

Max Depth

10,000 ft

First Permit

1985-12-13

Latest Activity

2011-06-08

Lifespan

25 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-03-26

Shut-In

Plugged

1988-12-20

!

EWA / Permit operator mismatch

Scheduling: MONTERO OPERATING INC. ≠ Permit: SHARP IMAGE ENERGY, INC.

Resolved via: schedulingMONTERO OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-01

Last Production

2026-03

Operator History

originally filed by SHARP IMAGE ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#717280 A SHARP IMAGE ENERGY, INC.
received 2011-05-26
#331497 A MONTERO OPERATING, INC.
received 1987-06-11
#292756 A MONTERO OPERATING, INC.
received 1985-12-13

Well Details

Well Number
C 4
Max Depth
10,000 ft
Drill Type
Vertical
County
HOWARD
District
8
Completed
1986-03-26

Operator

Location
MIDLAND
P-5 Status
Y (filed 1989-01-13)
Total Permits
48

External Links

Live © 2026 Petrora