42-227-33943

INJECTION

RINGNECK DOVE

HOWARD County · District 8 · DKL WATER GATHERING PERMIAN LLC · B.C. (CANYON)

RRC Lookup

Permits

3

Max Depth

10,145 ft

First Permit

1985-12-19

Latest Activity

2008-07-10

Lifespan

23 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2019-02-19

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: DKL WATER GATHERING PERMIAN LLC ≠ Production: SHARP IMAGE ENERGY, INC. (reported 2005-02)

!

EWA / Permit operator mismatch

Scheduling: DKL WATER GATHERING PERMIAN LLC ≠ Permit: WICHITA WATER LLC

Resolved via: schedulingDKL WATER GATHERING PERMIAN LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#663325 A WICHITA WATER LLC
received 2008-05-30
#551962 A SHARP IMAGE ENERGY, INC.
received 2004-10-06
#293445 A UNION OIL COMPANY OF CALIFORNIA
received 1986-03-17
#293445 A UNION OIL COMPANY OF CALIFORNIA
received 1985-12-19

Well Details

Well Number
1
Max Depth
10,145 ft
Drill Type
Vertical
County
HOWARD
District
8
Completed
2019-02-19

Operator

Location
PLANO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora