42-227-34880
SHUT INTALBOT 40
HOWARD County · District 8 · MULE KICK OPERATING LLC · TALBOT (CANYON)
Permits
2
Max Depth
9,000 ft
First Permit
1994-11-15
Latest Activity
1994-11-15
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2017-03-08
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Production operator mismatch
Scheduling: MULE KICK OPERATING LLC ≠ Production: BTA OIL PRODUCERS, LLC (reported 2014-09)
!
EWA / Permit operator mismatch
Scheduling: MULE KICK OPERATING LLC ≠ Permit: COSTILLA PETROLEUM CORPORATION
Resolved via: scheduling → MULE KICK OPERATING LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1995-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#429884 A COSTILLA PETROLEUM CORPORATION
received 1994-12-12
#429884 A COSTILLA PETROLEUM CORPORATION
received 1994-11-09
Well Details
- Well Number
- 1
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- HOWARD
- District
- 8
- Operator
- MULE KICK OPERATING LLC
- Completed
- 2017-03-08
Operator
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-09-17)
- Cum Oil (all leases)
- 41,175 bbl
- Cum Gas (all leases)
- 889 mcf
- Activities
- OPRS/G, OPRS/O