42-227-35983
PRODUCINGTWINS
HOWARD County · District 8 · PARTEE DRILLING INC. · SIGNAL PEAK (WOLFCAMP)
Permits
2
Max Depth
9,800 ft
First Permit
2005-10-11
Latest Activity
2016-08-12
Lifespan
11 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2005-12-23
Shut-In
—
Plugged
—
P-5 Org Status: Active
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2000-12
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#817523 A PARTEE DRILLING INC.
received 2016-08-04
#607601 A PARTEE DRILLING INC.
received 2005-10-10
Well Details
- Well Number
- 401
- Max Depth
- 9,800 ft
- Drill Type
- Vertical
- County
- HOWARD
- District
- 8
- Operator
- PARTEE DRILLING INC.
- Completed
- 2005-12-23
Operator
- Name
- PARTEE DRILLING INC
- Location
- BIG SPRING
- P-5 Status
- Y (filed 2025-12-04)
- Cum Oil (all leases)
- 2,989,592 bbl
- Cum Gas (all leases)
- 198,403 mcf
- Activities
- OPRS/O
- Total Permits
- 141