42-227-38190

INJECTION

WF LONG

HOWARD County · District 8 · DKL WATER GATHERING PERMIAN LLC · VEALMOOR

RRC Lookup

Permits

4

Max Depth

8,300 ft

First Permit

2014-08-25

Latest Activity

2018-06-28

Lifespan

4 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2022-05-17

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: DKL WATER GATHERING PERMIAN LLC ≠ Production: SABALO OPERATING, LLC (reported 2019-01)

!

EWA / Permit operator mismatch

Scheduling: DKL WATER GATHERING PERMIAN LLC ≠ Permit: SABALO OPERATING, LLC

Resolved via: schedulingDKL WATER GATHERING PERMIAN LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2014-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#841801 A SABALO OPERATING, LLC
received 2018-06-27
#792900 A FINLEY RESOURCES, INC.
received 2015-04-16
#792900 A FINLEY RESOURCES, INC.
received 2014-10-02
#792900 A FINLEY RESOURCES, INC.
received 2014-07-30
Lat 32.503304
Lon -101.523869

Well Details

Well Number
11
Max Depth
8,300 ft
Drill Type
Vertical
County
HOWARD
District
8
Completed
2022-05-17

Operator

Location
PLANO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora