42-227-38459
Final CompletionGRANTHAM-STOKES 31
HOWARD County · District 8 · SM ENERGY COMPANY · GARDEN CITY S. (WOLFCAMP)
Permits
1
Max Depth
12,000 ft
First Permit
2015-01-15
Latest Activity
2015-01-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2021-03-11
Shut-In
—
Plugged
2024-05-15
!
EWA / Permit operator mismatch
Scheduling: SM ENERGY COMPANY ≠ Permit: LAREDO PETROLEUM, INC.
Resolved via: scheduling → SM ENERGY COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2015-04
Last Production
2024-06
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#802789 A LAREDO PETROLEUM, INC.
received 2015-01-15
Well Details
- Well Number
- 1
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- HOWARD
- District
- 8
- Operator
- SM ENERGY COMPANY
- Completed
- 2021-03-11
Operator
- Name
- SM ENGY CO
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- 250,559,190 bbl
- Cum Gas (all leases)
- 1,980,285,662 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 2,434