42-235-31818
Final CompletionHARRIS T. WAYNE
IRION County · District 7 · SMITH PIPE OF ABILENE · WAYNE-HARRIS (CANYON)
Permits
1
Max Depth
7,700 ft
First Permit
1981-08-13
Latest Activity
1981-08-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-12-09
Shut-In
—
Plugged
1993-07-28
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RANSONE, ROBERT, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1993-09
Operator History
originally filed by RANSONE, ROBERT, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#130205 A RANSONE, ROBERT, INC.
received 1981-08-13
Well Details
- Well Number
- 70-1
- Max Depth
- 7,700 ft
- Drill Type
- Vertical
- County
- IRION
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1981-12-09
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf