42-235-32449
Final CompletionUNIVERSITY 3/BLK 43 A
IRION County · District 7 · FABCO · SPRABERRY (TREND AREA)
Permits
1
Max Depth
6,500 ft
First Permit
1984-11-12
Latest Activity
1984-11-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-01-29
Shut-In
—
Plugged
2009-01-20
!
EWA / Permit operator mismatch
Scheduling: FABCO ≠ Permit: PALO PETROLEUM, INC.
Resolved via: scheduling → FABCO
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by PALO PETROLEUM, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#257194 A PALO PETROLEUM, INC.
received 1984-10-29
Well Details
Operator
- Name
- FABCO
- Location
- BIG LAKE
- P-5 Status
- Y (filed 2011-06-03)
- Cum Oil (all leases)
- 64,879 bbl
- Cum Gas (all leases)
- — mcf