42-237-33701

Final Completion

TOMLINSON C. T.

JACK County · District 9 · SMITH PIPE OF ABILENE · MARYETTA SE. (CONGL)

RRC Lookup

Permits

1

Max Depth

6,100 ft

First Permit

1981-04-08

Latest Activity

1981-04-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-04-28

Shut-In

Plugged

1991-07-25

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RICHEY EXPLORATION CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Operator History

originally filed by RICHEY EXPLORATION CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#114358 A RICHEY EXPLORATION CO.
received 1981-04-08

Well Details

Well Number
1
Max Depth
6,100 ft
Drill Type
Vertical
County
JACK
District
9
Completed
1981-04-28

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora