42-237-36703

Final Completion

C.J.

JACK County · District 9 · SMITH PIPE OF ABILENE · PLEMONS (CONGLOMERATE)

RRC Lookup

Permits

1

Max Depth

4,990 ft

First Permit

1985-03-13

Latest Activity

1985-03-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-03-31

Shut-In

Plugged

2001-10-10

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: ENERGYPRO, INC. (reported 2000-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: M/E PETROLEUM, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2001-11

Operator History

originally filed by M/E PETROLEUM, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#269507 A M/E PETROLEUM, INC.
received 1985-03-04

Well Details

Well Number
1
Max Depth
4,990 ft
Drill Type
Vertical
County
JACK
District
9
Completed
1985-03-31

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora