42-237-37018

Final Completion

HAWKINS D. L.

JACK County · District 9 · CADDO CORPORATION · BEAR MOUNTAIN (MISSISSIPPI)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1985-11-20

Latest Activity

1985-11-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-01-18

Shut-In

Plugged

1995-12-13

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#290450 A CADDO CORPORATION
received 1985-11-07

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
JACK
District
9
Completed
1986-01-18

Operator

Location
AUSTIN
P-5 Status
Y (filed 2000-11-03)
Cum Oil (all leases)
9,823 bbl
Cum Gas (all leases)
138,646 mcf
Total Permits
39

External Links

Live © 2026 Petrora