42-237-37524

Final Completion

PLASTER THELMA

JACK County · District 9 · 3-R PRODUCTION INC. · CALLENDAR (WEIR)

RRC Lookup

Permits

1

Max Depth

2,500 ft

First Permit

1988-08-02

Latest Activity

1988-08-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-08-31

Shut-In

Plugged

2001-05-09

!

EWA / Permit operator mismatch

Scheduling: 3-R PRODUCTION INC. ≠ Permit: GATOR ENERGY

Resolved via: scheduling3-R PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#349235 A GATOR ENERGY
received 1988-07-22

Well Details

Well Number
4
Max Depth
2,500 ft
Drill Type
Vertical
County
JACK
District
9
Completed
1988-08-31

Operator

Location
JACKSBORO
P-5 Status
Y (filed 2023-03-06)
Cum Oil (all leases)
194,170 bbl
Cum Gas (all leases)
7,992,991 mcf
Total Permits
106

External Links

Live © 2026 Petrora