42-237-38095

Final Completion

COOPER J.B.

JACK County · District 9 · WAGGONER W. T. ESTATE · BOONSVILLE (BEND CONGL. GAS)

RRC Lookup

Permits

1

Max Depth

6,000 ft

First Permit

1994-03-23

Latest Activity

1994-03-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-04-05

Shut-In

Plugged

1995-02-16

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-04

Last Production

1995-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#421996 A WAGGONER, W. T., ESTATE
received 1994-03-14

Well Details

Well Number
B 2
Max Depth
6,000 ft
Drill Type
Vertical
County
JACK
District
9
Completed
1994-04-05

Operator

Location
VERNON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
1,860,576 bbl
Cum Gas (all leases)
193,140 mcf
Activities
GTHS/O
Total Permits
310

External Links

Live © 2026 Petrora