42-239-03351

Final Completion

BOLLING COLLIER OIL UNIT

JACKSON County · District 2 · ESENJAY PETROLEUM CORP. · COLLIER

RRC Lookup

Permits

1

Max Depth

3,505 ft

First Permit

1979-11-29

Latest Activity

1979-11-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-06

Shut-In

Plugged

1993-02-19

!

EWA / Permit operator mismatch

Scheduling: ESENJAY PETROLEUM CORP. ≠ Permit: TEXACO INC.

Resolved via: schedulingESENJAY PETROLEUM CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-03

Operator History

originally filed by TEXACO INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#65000 A TEXACO INC.
received 1979-11-29

Well Details

Well Number
10D
Max Depth
3,505 ft
Drill Type
Vertical
County
JACKSON
District
2
Completed
1980-03-06

Operator

Location
CORPUS CHRS, TI
P-5 Status
Y (filed 1999-01-08)
Cum Oil (all leases)
98,869 bbl
Cum Gas (all leases)
13,561,380 mcf
Total Permits
381

External Links

Live © 2026 Petrora