42-239-31614

Final Completion

WESTHOFF W.T.

JACKSON County · District 2 · TEPCO ENGINEERING · TEXANA NORTH (6170)

RRC Lookup

Permits

3

Max Depth

7,314 ft

First Permit

1981-04-21

Latest Activity

2002-05-20

Lifespan

21 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-11-28

Shut-In

Plugged

2009-03-18

!

EWA / Production operator mismatch

Scheduling: TEPCO ENGINEERING ≠ Production: ENCON SERVICES, INC. (reported 2007-06)

!

EWA / Permit operator mismatch

Scheduling: TEPCO ENGINEERING ≠ Permit: FFA PETROLEUM SERVICES, INC.

Resolved via: schedulingTEPCO ENGINEERING

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#520045 A FFA PETROLEUM SERVICES, INC.
received 2002-05-16
#327760 A TEPCO ENGINEERING
received 1987-03-16
#115725 A TEPCO ENGINEERING
received 1981-04-21

Well Details

Well Number
1
Max Depth
7,314 ft
Drill Type
Vertical
County
JACKSON
District
2
Completed
1982-11-28

Operator

Location
ALICE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G
Total Permits
79

External Links

Live © 2026 Petrora