42-239-31885
Final CompletionCANERDAY E.
JACKSON County · District 2 · W.A.M. ENERGY · PALMETTO BEND W. (B-9)
Permits
2
Max Depth
7,500 ft
First Permit
1983-07-01
Latest Activity
1987-03-18
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-02-18
Shut-In
—
Plugged
2016-11-17
!
EWA / Permit operator mismatch
Scheduling: W.A.M. ENERGY ≠ Permit: TEPCO ENGINEERING
Resolved via: scheduling → W.A.M. ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by TEPCO ENGINEERING — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#327696 A TEPCO ENGINEERING
received 1987-03-13
#200298 A TRINITY RESOURCES, INC.
received 1983-07-01
Well Details
- Well Number
- 4
- Max Depth
- 7,500 ft
- Drill Type
- Vertical
- County
- JACKSON
- District
- 2
- Operator
- W.A.M. ENERGY
- Completed
- 1987-02-18
Operator
- Name
- W.A.M. ENERGY
- Location
- DOVER
- P-5 Status
- Y (filed 2016-10-07)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf