42-239-32271

Final Completion

LAYDEN PETE

JACKSON County · District 2 · KEN PETROLEUM CORPORATION · LOST BRIDGE (YEGUA 7900)

RRC Lookup

Permits

2

Max Depth

10,500 ft

First Permit

1986-02-22

Latest Activity

2006-02-24

Lifespan

20 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-04-05

Shut-In

Plugged

2010-12-28

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2010-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#614822 A KEN PETROLEUM CORPORATION
received 2006-02-24
#298459 A CPC EXPLORATION INC.
received 1986-02-21

Well Details

Well Number
1
Max Depth
10,500 ft
Drill Type
Vertical
County
JACKSON
District
2
Completed
1980-04-05

Operator

Location
DALLAS
P-5 Status
Y (filed 2019-03-08)
Cum Oil (all leases)
423,064 bbl
Cum Gas (all leases)
11,430,028 mcf
Total Permits
159

External Links

Live © 2026 Petrora