42-239-33417

PRODUCING

HOLZHEAUSER A

JACKSON County · District 2 · FAULCONER ENERGY LLC · EL TORO BUENO (AY-3)

RRC Lookup

Permits

2

Max Depth

11,850 ft

First Permit

2007-07-19

Latest Activity

2007-07-19

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2007-11-01

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: HOLLIMON OIL CORPORATION

Resolved via: productionFAULCONER ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2007-11

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#641810 A HOLLIMON OIL CORPORATION
received 2007-10-05
#641810 A HOLLIMON OIL CORPORATION
received 2007-07-03

Well Details

Well Number
1
Max Depth
11,850 ft
Drill Type
Vertical
County
JACKSON
District
2
Completed
2007-11-01

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora