42-241-30437

TEMP ABANDONED Directional

HANKAMER ET AL

JASPER County · District 3 · PETRO-SMITH OPERATING LLC · BUNA WEST (WILCOX)

RRC Lookup

Permits

2

Max Depth

13,000 ft

First Permit

1985-05-22

Latest Activity

2011-11-30

Lifespan

27 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

1985-08-02

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Production operator mismatch

Scheduling: PETRO-SMITH OPERATING LLC ≠ Production: KERR-MCGEE OIL & GAS ONSHORE LP (reported 2006-11)

!

EWA / Permit operator mismatch

Scheduling: PETRO-SMITH OPERATING LLC ≠ Permit: GOLDKING ONSHORE OPERATING, LLC

Resolved via: schedulingPETRO-SMITH OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#728074 A GOLDKING ONSHORE OPERATING, LLC
received 2011-11-10
#275750 A RIO BRAVO OIL COMPANY
received 1985-05-22

Well Details

Well Number
2
Max Depth
13,000 ft
Drill Type
Directional
County
JASPER
District
3
Completed
1985-08-02

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
1,068 bbl
Cum Gas (all leases)
38,627 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora