42-249-01442
Final CompletionHOFFMAN N. A.
JIM WELLS County · District 4 · RINCON PETROLEUM CORPORATION · MARY (FRIO 3900)
Permits
2
Max Depth
3,913 ft
First Permit
2008-07-03
Latest Activity
2009-02-06
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2009-07-13
Shut-In
—
Plugged
2013-07-31
!
EWA / Permit operator mismatch
Scheduling: RINCON PETROLEUM CORPORATION ≠ Permit: MISSION RIVER SYSTEMS, INC.
Resolved via: scheduling → RINCON PETROLEUM CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2009-07
Last Production
2013-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#664576 A MISSION RIVER SYSTEMS, INC.
received 2009-01-15
#664576 A KEBO OIL & GAS, INC.
received 2008-06-16
Well Details
- Well Number
- 1
- Max Depth
- 3,913 ft
- Drill Type
- Vertical
- County
- JIM WELLS
- District
- 4
- Operator
- RINCON PETROLEUM CORPORATION
- Completed
- 2009-07-13
Operator
- Name
- RINCON PETRO CORP
- Location
- CORPUS CHRS, TI
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- 988,629 bbl
- Cum Gas (all leases)
- 50,685,774 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 259