42-249-31210

Final Completion

BURKET-BOERNER GAS UNIT

JIM WELLS County · District 4 · BETTIS BOYLE & STOVALL · HENSHAW (4000 SAND)

RRC Lookup

Permits

1

Max Depth

5,300 ft

First Permit

1980-05-19

Latest Activity

1980-05-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-06-19

Shut-In

Plugged

1984-10-16

!

EWA / Permit operator mismatch

Scheduling: BETTIS BOYLE & STOVALL ≠ Permit: TEPCO ENGINEERING

Resolved via: schedulingBETTIS BOYLE & STOVALL

Operator History

originally filed by TEPCO ENGINEERING — asset transferred

Permit Applications (1)

#81540 A TEPCO ENGINEERING
received 1980-05-19

Well Details

Well Number
2
Max Depth
5,300 ft
Drill Type
Vertical
County
JIM WELLS
District
4
Completed
1980-06-19

Operator

Location
GRAHAM
P-5 Status
Y (filed 2022-10-07)
Cum Oil (all leases)
6,597,364 bbl
Cum Gas (all leases)
9,063,237 mcf
Total Permits
530

External Links

Live © 2026 Petrora