42-253-30466

Final Completion

PHILLIPS HOWARD MRS.

JONES County · District 7 · RIDLEY J. K. · NOODLE W. (NOODLE CREEK)

RRC Lookup

Permits

2

Max Depth

4,800 ft

First Permit

1978-06-05

Latest Activity

1980-08-04

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-05-15

Shut-In

Plugged

1994-06-09

!

EWA / Production operator mismatch

Scheduling: RIDLEY J. K. ≠ Production: STAR PRODUCTION, INC. (reported 2001-04)

Resolved via: schedulingRIDLEY J. K.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#88584 A RIDLEY, J. K.
received 1980-08-04
#25798 A RIDLEY, J. K.
received 1978-06-05

Well Details

Well Number
8
Max Depth
4,800 ft
Drill Type
Vertical
County
JONES
District
7
Operator
RIDLEY J. K.
Completed
1978-05-15

Operator

Location
ABILENE
P-5 Status
Y (filed 1992-07-08)
Total Permits
14

External Links

Live © 2026 Petrora