42-253-31117
Final CompletionPHILLIPS HOWARD MRS.
JONES County · District 7 · RIDLEY J. K. · NOODLE W. (NOODLE CREEK)
Permits
1
Max Depth
5,000 ft
First Permit
1978-12-11
Latest Activity
1978-12-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-02-23
Shut-In
—
Plugged
1996-04-26
!
EWA / Production operator mismatch
Scheduling: RIDLEY J. K. ≠ Production: STAR PRODUCTION, INC. (reported 2001-04)
Resolved via: scheduling → RIDLEY J. K.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2007-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#38508 A RIDLEY, J. K.
received 1978-12-11
Well Details
- Well Number
- 6
- Max Depth
- 5,000 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- RIDLEY J. K.
- Completed
- 1979-02-23
Operator
- Name
- RIDLEY, J. K
- Location
- ABILENE
- P-5 Status
- Y (filed 1992-07-08)
- Total Permits
- 14