42-253-31166

Final Completion

CULLERS&BAILEY (CANYON SAND)UNIT

JONES County · District 7 · HPC OPERATING INC. · CULLERS&BAILEY (CANYON SAND)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1979-03-23

Latest Activity

1979-03-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-04-23

Shut-In

Plugged

1988-10-29

!

EWA / Permit operator mismatch

Scheduling: HPC OPERATING INC. ≠ Permit: HILL PRODUCTION COMPANY

Resolved via: schedulingHPC OPERATING INC.

Operator History

originally filed by HILL PRODUCTION COMPANY — asset transferred

Permit Applications (1)

#44909 A HILL PRODUCTION COMPANY
received 1979-03-23

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1979-04-23

Operator

Location
DALLAS
P-5 Status
Y (filed 1999-04-05)
Cum Oil (all leases)
564,659 bbl
Cum Gas (all leases)
1,986,117 mcf
Total Permits
48

External Links

Live © 2026 Petrora