42-253-31541

Final Completion

BOYD JOHN

JONES County · District 7 · SMITH PIPE OF ABILENE · JONES COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

2,700 ft

First Permit

1980-07-21

Latest Activity

1980-07-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-03-15

Shut-In

Plugged

1993-07-07

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BOYD, JOHN F.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-10

Operator History

originally filed by BOYD, JOHN F. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#87279 A BOYD, JOHN F.
received 1980-07-21

Well Details

Well Number
4
Max Depth
2,700 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1983-03-15

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora