42-253-31558

Final Completion

CULLERS&BAILEY (CANYON SAND)UNIT

JONES County · District 7 · HPC OPERATING INC. · CULLERS&BAILEY (CANYON SAND)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1980-08-06

Latest Activity

1980-08-06

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-09-07

Shut-In

Plugged

1990-01-30

!

EWA / Permit operator mismatch

Scheduling: HPC OPERATING INC. ≠ Permit: HILL PRODUCTION COMPANY

Resolved via: schedulingHPC OPERATING INC.

Operator History

originally filed by HILL PRODUCTION COMPANY — asset transferred

Permit Applications (1)

#88862 A HILL PRODUCTION COMPANY
received 1980-08-06

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1980-09-07

Operator

Location
DALLAS
P-5 Status
Y (filed 1999-04-05)
Cum Oil (all leases)
564,659 bbl
Cum Gas (all leases)
1,986,117 mcf
Total Permits
48

External Links

Live © 2026 Petrora