42-253-31603

U

SMITH

JONES County · District 7 · SMITH PIPE OF ABILENE · NOODLE NW. (CANYON SD. 4100)

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1980-09-09

Latest Activity

1980-09-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-12-15

Shut-In

Plugged

1983-11-26

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEAGO OIL, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Operator History

originally filed by SEAGO OIL, INC. — asset transferred

Permit Applications (1)

#91963 A SEAGO OIL, INC.
received 1980-09-09

Well Details

Well Number
3
Max Depth
4,500 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1980-12-15

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora