42-253-32102

Final Completion

SADDLER

JONES County · District 7 · NUEVE OPERATING CO. OF TEXAS · PITZER (5100 SAND)

RRC Lookup

Permits

1

Max Depth

5,450 ft

First Permit

1981-12-18

Latest Activity

1981-12-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-04-15

Shut-In

Plugged

1984-04-24

!

EWA / Permit operator mismatch

Scheduling: NUEVE OPERATING CO. OF TEXAS ≠ Permit: PENROC ENERGY

Resolved via: schedulingNUEVE OPERATING CO. OF TEXAS

Operator History

originally filed by PENROC ENERGY — asset transferred

Permit Applications (1)

#144739 A PENROC ENERGY
received 1981-12-18

Well Details

Well Number
1
Max Depth
5,450 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1982-04-15

Operator

Location
ABILENE
P-5 Status
Y (filed 1986-06-13)
Total Permits
286

External Links

Live © 2026 Petrora