42-253-32977
Final CompletionCARTER
JONES County · District 7 · CARTER OIL & GAS · NOODLE N. (CISCO LOWER)
Permits
1
Max Depth
4,000 ft
First Permit
1984-06-08
Latest Activity
1984-06-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-07-10
Shut-In
—
Plugged
2002-07-26
!
EWA / Permit operator mismatch
Scheduling: CARTER OIL & GAS ≠ Permit: WOODBINE EXPLORATION
Resolved via: scheduling → CARTER OIL & GAS
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by WOODBINE EXPLORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#241498 A WOODBINE EXPLORATION
received 1984-06-08
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- CARTER OIL & GAS
- Completed
- 1984-07-10
Operator
- Name
- CARTER OIL & GAS
- Location
- ABILENE
- P-5 Status
- Y (filed 2002-04-05)
- Cum Oil (all leases)
- 2,608 bbl
- Cum Gas (all leases)
- — mcf