42-253-33282

Final Completion

SHINNERY HOPE LIME UNIT

JONES County · District 7 · SMITH PIPE OF ABILENE · SHINNERY (HOPE LIME)

RRC Lookup

Permits

1

Max Depth

2,500 ft

First Permit

1985-08-16

Latest Activity

1985-08-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-09-04

Shut-In

Plugged

1997-09-29

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: HEART LAND PETROLEUM CORPORATION (reported 1995-09)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: ROCO PETROLEUM, INCORPORATED

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#282802 A ROCO PETROLEUM, INCORPORATED
received 1985-08-15

Well Details

Well Number
1
Max Depth
2,500 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1985-09-04

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora