42-253-33338
Final CompletionSHINNERY HOPE LIME UNIT
JONES County · District 7 · SMITH PIPE OF ABILENE · SHINNERY (HOPE LIME)
Permits
1
Max Depth
2,500 ft
First Permit
1985-10-25
Latest Activity
1985-10-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-11-28
Shut-In
—
Plugged
1997-10-01
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: HEART LAND PETROLEUM CORPORATION (reported 1995-09)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: COTTONWOOD PETROLEUM CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#288427 A COTTONWOOD PETROLEUM CO.
received 1985-10-25
Well Details
- Well Number
- 1
- Max Depth
- 2,500 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-11-28
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf