42-253-33345
Final CompletionLAWLIS A
JONES County · District 7 · STARTEX ENERGY INC. · NOODLE NW. (CANYON SD. 3900)
Permits
1
Max Depth
4,200 ft
First Permit
1985-11-04
Latest Activity
1985-11-04
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-01-15
Shut-In
—
Plugged
1999-10-05
!
EWA / Permit operator mismatch
Scheduling: STARTEX ENERGY INC. ≠ Permit: HARKEN PRODUCTION CO.
Resolved via: scheduling → STARTEX ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by HARKEN PRODUCTION CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#289081 A HARKEN PRODUCTION CO.
received 1985-11-04
Well Details
- Well Number
- 3
- Max Depth
- 4,200 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- STARTEX ENERGY INC.
- Completed
- 1986-01-15
Operator
- Name
- STARTEX ENGY, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2008-07-03)
- Cum Oil (all leases)
- 22,801 bbl
- Cum Gas (all leases)
- 53,865 mcf
- Total Permits
- 11