42-253-33473

U

HARRISON

JONES County · District 7 · SMITH PIPE OF ABILENE · NOODLE NW. (CANYON SD. 3900)

RRC Lookup

Permits

1

Max Depth

4,200 ft

First Permit

1986-06-04

Latest Activity

1986-06-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-01-05

Shut-In

Plugged

1993-06-18

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PACER PETROLEUM, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by PACER PETROLEUM, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#302852 A PACER PETROLEUM, INC.
received 1986-06-02

Well Details

Well Number
5
Max Depth
4,200 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1987-01-05

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora