42-253-33630
Final CompletionDANIELS BETTY
JONES County · District 7 · D.J. & T. ENERGY · PARHAM (CRYSTAL FALLS)
Permits
1
Max Depth
2,999 ft
First Permit
1987-07-22
Latest Activity
1987-07-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-08-08
Shut-In
—
Plugged
2014-02-26
!
EWA / Production operator mismatch
Scheduling: D.J. & T. ENERGY ≠ Production: NEATHERLIN, EARL INC. (reported 2006-03)
!
EWA / Permit operator mismatch
Scheduling: D.J. & T. ENERGY ≠ Permit: NEATHERLIN, EARL INC.
Resolved via: scheduling → D.J. & T. ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by NEATHERLIN, EARL INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#333260 A NEATHERLIN, EARL INC.
received 1987-07-22
Well Details
- Well Number
- 2
- Max Depth
- 2,999 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- D.J. & T. ENERGY
- Completed
- 1987-08-08
Operator
- Name
- D.J. & T. ENGY
- Location
- ABILENE
- P-5 Status
- Y (filed 2026-01-04)
- Cum Oil (all leases)
- 151,360 bbl
- Cum Gas (all leases)
- 111,931 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 10