42-253-33693

Final Completion

REED

JONES County · District 7 · STARTEX ENERGY INC. · FORT PHANTOM (HOPE LIME)

RRC Lookup

Permits

1

Max Depth

2,500 ft

First Permit

1988-03-03

Latest Activity

1988-03-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-09-01

Shut-In

Plugged

1991-04-08

!

EWA / Permit operator mismatch

Scheduling: STARTEX ENERGY INC. ≠ Permit: TEX-STAR ENERGY

Resolved via: schedulingSTARTEX ENERGY INC.

Operator History

originally filed by TEX-STAR ENERGY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#343269 A TEX-STAR ENERGY
received 1988-02-29

Well Details

Well Number
2
Max Depth
2,500 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1988-09-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2008-07-03)
Cum Oil (all leases)
22,801 bbl
Cum Gas (all leases)
53,865 mcf
Total Permits
11

External Links

Live © 2026 Petrora