42-253-34001
Final CompletionPOMROY R. O.
JONES County · District 7 · ROCO PETROLEUM INCORPORATED · NOODLE (ELLENBURGER)
Permits
1
Max Depth
5,400 ft
First Permit
1992-07-02
Latest Activity
1992-07-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-07-27
Shut-In
—
Plugged
2013-05-30
EWA / Production operator mismatch
Scheduling: ROCO PETROLEUM INCORPORATED ≠ Production: HEART LAND PETROLEUM CORPORATION (reported 1995-11)
EWA / Permit operator mismatch
Scheduling: ROCO PETROLEUM INCORPORATED ≠ Permit: HEART LAND PETROLEUM CORPORATION
Resolved via: scheduling → ROCO PETROLEUM INCORPORATED
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2013-10
Operator History
originally filed by HEART LAND PETROLEUM CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
Well Details
- Well Number
- 2
- Max Depth
- 5,400 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- ROCO PETROLEUM INCORPORATED
- Completed
- 1992-07-27
Operator
- Name
- ROCO PETRO, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- 240,607 bbl
- Cum Gas (all leases)
- 33,350 mcf
- Activities
- OPRS/O
- Total Permits
- 74