42-253-34211

Final Completion

RAINWATER

JONES County · District 7 · SOJOURNER DRILLING CORPORATION · TWO POINTS LEFT (CANYON UP.)

RRC Lookup

Permits

1

Max Depth

4,900 ft

First Permit

1994-12-09

Latest Activity

1994-12-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-03-13

Shut-In

Plugged

2013-06-13

!

EWA / Permit operator mismatch

Scheduling: SOJOURNER DRILLING CORPORATION ≠ Permit: FISHER, JACK INC.

Resolved via: schedulingSOJOURNER DRILLING CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-03

Last Production

2013-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#430757 A FISHER, JACK INC.
received 1994-12-08

Well Details

Well Number
1
Max Depth
4,900 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1995-03-13

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
11,100,018 bbl
Cum Gas (all leases)
9,636,290 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/O, OPRS/G, OPRS/O
Total Permits
869

External Links

Live © 2026 Petrora