42-253-34654

SHUT IN

BOWERS

JONES County · District 7 · STRAWN OPERATING CO. L.L.C. · NOODLE (PALO PINTO)

RRC Lookup

Permits

3

Max Depth

5,900 ft

First Permit

2004-05-13

Latest Activity

2004-09-23

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2004-07-01

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: STRAWN OPERATING CO. L.L.C. ≠ Production: SEAGO OPERATING CO., L.L.C. (reported 2006-07)

!

EWA / Permit operator mismatch

Scheduling: STRAWN OPERATING CO. L.L.C. ≠ Permit: SEAGO OPERATING CO., L.L.C.

Resolved via: schedulingSTRAWN OPERATING CO. L.L.C.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-07

Last Production

2026-03

Operator History

originally filed by SEAGO OPERATING CO., L.L.C. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#551236 A SEAGO OPERATING CO., L.L.C.
received 2004-09-20
#545644 A SEAGO OPERATING CO., L.L.C.
received 2004-07-13
#545644 A SEAGO OPERATING CO., L.L.C.
received 2004-05-13

Well Details

Well Number
1
Max Depth
5,900 ft
Drill Type
Vertical
County
JONES
District
7
Completed
2004-07-01

Operator

Location
EL PASO
P-5 Status
Y (filed 2026-01-05)
Cum Oil (all leases)
22,215 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
15

External Links

Live © 2026 Petrora