42-253-35282

Final Completion

MUELLER FARMS

JONES County · District 7 · HOFCO INC. · JONES COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

2012-08-24

Latest Activity

2012-08-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2013-01-02

Shut-In

Plugged

2020-07-07

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2012-01

Last Production

2021-01

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#745933 A HOFCO, INC.
received 2012-08-06

Well Details

Well Number
3
Max Depth
3,000 ft
Drill Type
Vertical
County
JONES
District
7
Operator
HOFCO INC.
Completed
2013-01-02

Operator

Location
ABILENE
P-5 Status
Y (filed 2023-03-06)
Cum Oil (all leases)
149,161 bbl
Cum Gas (all leases)
193,565 mcf
Total Permits
143

External Links

Live © 2026 Petrora