42-257-30345
Final CompletionWYNNE A. B
KAUFMAN County · District 5 · FAIR OIL LC · WALTER FAIR (WOODBINE)
Permits
1
Max Depth
4,300 ft
First Permit
1987-11-17
Latest Activity
1987-11-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-11-29
Shut-In
—
Plugged
1998-09-17
!
EWA / Permit operator mismatch
Scheduling: FAIR OIL LC ≠ Permit: FAIR OIL COMPANY
Resolved via: scheduling → FAIR OIL LC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-09
Operator History
originally filed by FAIR OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#338935 A FAIR OIL COMPANY
received 1987-11-16
Well Details
- Well Number
- 9
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- KAUFMAN
- District
- 5
- Operator
- FAIR OIL LC
- Completed
- 1987-11-29
Operator
- Name
- FAIR OIL, LC
- Location
- TYLER
- P-5 Status
- Y (filed 1999-10-01)
- Cum Oil (all leases)
- 328,100 bbl
- Cum Gas (all leases)
- 4,635,383 mcf
- Total Permits
- 5