42-261-31363

Final Completion

ARMSTRONG TOBIN

KENEDY County · District 4 · HEADINGTON OIL COMPANY LLC · CANDELARIA (CONSOLIDATED)

RRC Lookup

Permits

1

Max Depth

7,300 ft

First Permit

2004-05-14

Latest Activity

2004-05-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2004-06-25

Shut-In

Plugged

2008-06-30

!

EWA / Production operator mismatch

Scheduling: HEADINGTON OIL COMPANY LLC ≠ Production: HEADINGTON OIL COMPANY, L.P. (reported 2005-02)

!

EWA / Permit operator mismatch

Scheduling: HEADINGTON OIL COMPANY LLC ≠ Permit: HEADINGTON OIL COMPANY, L.P.

Resolved via: schedulingHEADINGTON OIL COMPANY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-06

Last Production

2008-06

Operator History

originally filed by HEADINGTON OIL COMPANY, L.P. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#545711 A HEADINGTON OIL COMPANY, L.P.
received 2004-05-14

Well Details

Well Number
8
Max Depth
7,300 ft
Drill Type
Vertical
County
KENEDY
District
4
Completed
2004-06-25

Operator

Location
DALLAS
P-5 Status
Y (filed 2015-03-06)
Cum Oil (all leases)
151,873 bbl
Cum Gas (all leases)
80,129,355 mcf
Total Permits
45

External Links

Live © 2026 Petrora